1. Home
  2. Knowledge Base
  3. Works History
  4. Works History: Work History Listing

Works History: Work History Listing

OVERVIEW

This window opens when you operate the Process — Shopfloor — Review History for Part menu function. It enables you to view the costed operational batch history for all work orders for an assembly.

File Path

Process > Shopfloor > Review History for Part

This file path takes you to the Work History Listing window

Graphical user interface, application

Description automatically generated

Part Number

Part number unique identifier. {PTMFILE.PTMPTNO char 18}

Up and Down Arrows

Use these arrows to move through the part numbers.

Description

Part description. {PTMFILE.PTMDESC char 40}

Stock UoM

Standard stock unit of measure. {PTMFILE.PTMSTUM char 6}

History List

Lists the work history records for the assembly, one line per posted operation batch.

The list carries the following columns:

Column HeaderDescription
WOThe Work Order number the operation was posted against.
User ReferenceThe Work Order user reference.
Op NoThe operation number within the process route.
ReceivedThe quantity of the assembly received by this posting.
ScrappedThe quantity scrapped by this posting.
Assy CostThe assembly cost for the posting.
Planned CostThe planned work centre cost, based on the process route times.
Actual CostThe actual work centre cost, based on the times actually recorded.
WCThe work centre code the operation was performed at.
EmployeeThe employee code recorded against the operation.
Run TimeThe run time recorded for the operation.
Setup TimeThe setup time recorded for the operation.
Total TimeThe total of recorded runtime and setup time.
Trans IDThe Work Order history sequence number of the posting. The same identifier is shown in the Log Work Order Operational Performance and Work Tracking Analysis windows, and is used when deleting a posted operation.
Scrap CodeThe scrap reason code recorded against the scrapped quantity. Scrap reason codes are defined in File — System Manager — Index Codes.
Scrap ReasonThe description of the scrap reason code.
Work CentreThe description of the work centre the operation was performed at.

TIP: Double-click a line to open the Log Work Order Operational Performance window with that line pre-selected, so the posting can be examined or amended without re-selecting it.

Total Net Quantity

The net received quantity of the assembly listed.

Average Unit Assembly Cost

The average unit assembly cost.

Average Planned Work Centre Cost

The average unit planned work centre cost based on route times.

Average Actual Work Centre Cost

The average unit actual work centre cost based on actual times.

Compiled in Program Version 6.00. Help data last modified 23 June 2022.

Class wWohList last modified 25 May 2022.

Was this article helpful?

Related Articles

Get started.

Try our state-of-the-art ERP Manufacturing Software today.