Work Order Graphical Layout
This subwindow contains a constructed chart of your work order schedule. The work order number is shown on the left and the vertical order reflects that of the Listing pane.
The work order position in the calendar is shown by the coloured bar horizontally positioned with respect to the latest start date and completion date. The text inside is made up of: Latest Start Date — Assembly Part Number — (Lead : Actual) — Completion Date. If it is not fully visible, switch on Window Tooltips from the Help menu and each will show the full details in a tooltip as you pass the mouse other them.
You can re-position the work orders by drag and drop. The change will be reflected in the Listing pane.
You can modify the appearance of the chart with the two controls below.
Field |
Description |
---|---|
Maximum Width |
The maximum width in pixels that the chart will display. |
Vertical Gap |
The vertical gap in pixels between work orders. |
See also: – |