Team Calendar Settings
This window opens when you click on the Settings button below and to the left of the main calender in the Team Calendar window.
There are numerous settings that can be adjusted to reflect the way a user wants to view and work with the Team Calendar. These are stored along with other user settings in the datafile. When a user opens the Team Calendar the stored settings are re-applied along with default event search parameters, default event parameters and the view mode that the user last operated the Team Calendar with.
These settings are automatically saved when the user closes the Team Calendar window and therefore there is no need for a Save or Ok button on this window. Any change to a setting you make will immediately be reflected in the Team Calendar window.
Field |
Description |
---|---|
Show Today Bold |
Check to show today’s date in bold font. |
Show Icons |
To control whether icons are shown on event boxes. |
Show Times |
To control whether the start time is shown on event boxes. |
Show Rounded Boxes |
To control whether event boxes are shown as rounded box style. |
No Background |
When not rounded boxes, this controls whether there is any background colour. |
Am/Pm string |
Enter a am/pm set of characters which controls how the time is displayed for morning and afternoon, separated by a / character. Leave blank for a 24hr clock representation. |
Snap events at (minutes) |
During drag-and-drop, this controls the units or minutes the event will snap to. |
Minimum event width (%) |
When events overlap, this controls how small concurrent events are shown before up-down arrows are used. This applies to day views. |
Title font size |
Use the slider to set the size of the title font. |
Heading font size |
Use the slider to set the size of the heading font. |
Day/event font size |
Use the slider to set the size of the main calendar and events font. |
Day starts at |
For day views, this controls the start of the indicated working day. |
Day ends at |
For day views, this controls the end of the indicated working day. |
Show hours at a time |
This controls the vertical scale of the day views in hours before scrolling is needed. |
Show days in Day Plan |
This controls the number of days shown in the Day Plan view. |
Start week on |
This controls the start day of the week for some views. |
Days shown in week view |
This controls the number of days shown starting on the start day when in week view. |
Auto-Complete Past Events |
To control whether on opening the calendar any past events will be automatically marked completed when you have a minimum of status privileges for the resource. |
Auto-Delete Events older than: |
To control whether on opening the calendar past events older than the following number of days will be automatically deleted when you have full privileges for an associated resource. |
Days |
The number of days old an event has to be before auto-deletion is effective. |
Item of colour list |
Click to select a colour to change. Use the toolbar to change background and text colour. |
Sample colours |
An example of the background and/or text colour of the selected item of colour. Use the toolbar to change background and text colour depending on your list selection. |
TIP: The font size controls are a slight exception to other settings in that they control Environment Style properties. Environment Style Properties are stored in the copy of Caliach Vision (Vision.lbs) that you running with. Therefore in the case of font sizes, if you log in under your user ID on another copy of the programme, different font sizes may apply. This is because it is platform-dependant (different on Windows, Linux and Macintosh).
There are in fact 6 Environment Scheme Elements for the Team Calendar, Title, Heading and Main for both the small and large calendars. In each of these six you can control the Font and Size and for the title and heading also the font style (bold, etc.). The main part of the calendars do not have control of font style otherwise the today-bold would not be possible. Note that if you play with these with the Environment Designer, changes only take effect when when the calendars are redrawn by you activating the calendar window.
See also: – |
Compiled in Program Version 5.10. Help data last modified 4 Jun 2012 04:47:00.00. Class wTeamCalSettings last modified 10 Oct 2017 11:48:58.